
Westmere painters for bungalows and state houses
Between November and April, Westmere bungalows and raised two-storey homes get their outside coats, and the rooms suit any month. Chris calls round and quotes you a fixed price.
- House types
- Bungalows, state houses, raised homes
- Up high
- Eaves, rafters, shingled gables
- Your price in two days
- Chris usually comes out the next day
- Postcode
- 1022
Sanded back, then repainted
Home Shield has painted two houses for me - inside and out - and did a fantastic job both times. The team is lovely to deal with and went above and beyond.


Your Westmere quote, item by item
Eaves and gables take real time on a Westmere bungalow, so they’re priced in from the start.
What drives the cost
- Deep eaves, rafter ends and shingled gables
- A raised second storey that needs scaffold
- Walls facing the harbour
Prep we include
- Shingles primed on their own before the colour
- Mould washed off damp, shaded walls
- Soft timber cut back and rebuilt with Repaircare
- Old layers sanded back to a firm base


What the timing hangs on
- How much overhead detail there is
- Drying time on shaded walls
- The warm, drier months for the outside
Get a free quote Or call 0800 166 021
Bungalows, state houses and raised homes
Westmere began as a 1920s estate of bungalows, and state houses joined them through the late 1920s and 1930s. Plenty have since been lifted to two storeys.
Outside, we wash and sand back and put soft timber right with Repaircare. Then we paint your boards from the ground up to the deep eaves and shingled gables.
On a raised house we paint both levels inside, ceilings and doors included, with any gib stopping organised. Just the eaves or your deck railings is a welcome job too.
Outside and in
Our exterior repaints and interior painting run the same way here.
Westmere’s painting months
- Jan20.0°8 wet days
- Feb20.5°7 wet days
- Mar18.9°8 wet days
- Apr16.6°11 wet days
- May14.2°12 wet days
- Jun12.1°15 wet days
- Jul11.2°16 wet days
- Aug11.7°15 wet days
- Sep13.1°13 wet days
- Oct14.6°12 wet days
- Nov16.2°10 wet days
- Dec18.5°9 wet days
- Outside months, 16° or warmer on average with 11 wet days or fewer
- Shoulder months, outside on dry days
- Inside months
- Inside work, every month
Settled weather from November to April suits the shoreline walls. Inside work fits any month. Plan yours on the painting calendar
Eaves, shingles and the harbour edge
A Westmere bungalow keeps most of its work up high. The deep eaves and shingled gables need careful scraping and brushing, and shingles get a primer coat of their own.
Shoreline homes on the peninsula take salt and wind on their harbour walls. Where a house has been raised, we scaffold the top floor and wash the seaward side before any paint goes on.
Around Coxs Bay, sheltered by Meola Reef, homes sit low among trees by the creek and the walkway. Those walls stay damp, so we wash off the mould and let the boards dry properly before priming.

Excellent communication and service.
Quoting and painting in Westmere
Chris sees your eaves and gables up close before pricing them, and our painters do the rest.
- Master Painters New Zealandmembers
- Resene Eco.Decoratorlow-VOC, waterborne paints first
- Monday to Saturdayon the tools
Before we paint your Westmere house
- Count your eaves and shingled gables into the scope. On a Westmere bungalow, that overhead detail is half the job.
- If the house has been raised, make sure the upper storey is quoted with scaffold. The top boards face the harbour and need the closest prep.
- Near Coxs Bay, pull climbers and shrubs back from the walls a few days before we start, so the boards can air out.
Westmere repaint questions
Our bungalow’s eaves are flaking but the walls look fine. Can you do just the eaves?
Yes. We check your eaves and fascias for soft timber and price that work on its own. If the walls aren’t far behind, we’ll say so, and you can decide whether to do both while the ladders are up.
We raised our state house to two storeys. Does that change the job?
Mostly the access. The upper storey needs scaffolding, which we organise and include. The newer lower level often has different cladding, so each part is prepped for what it is.
Our 1930s state house has layers of old paint. How far back do you go?
Back to a firm base. Several owners’ worth of paint gets sanded until the new coats have something sound to hold on to.
We paint in Western Springs as well, across the motorway from the Te Wai Ōrea lake park, where 1920s council houses stand beside 1930s state houses. Along the coast and inland, we also cover Herne Bay, Grey Lynn, Point Chevalier and Ponsonby. See every suburb
Send us your Westmere job
A photo of the eaves and gables is the most useful one.
Worth putting in
- Your suburb
- Outside, inside or both
- The type of home, and one storey or two
- How many rooms, for inside work
- The month you have in mind
- A few photos of each side, and any soft timber or cracks
We ring back to set a time, and Chris usually comes out the next day. You have the fixed price within two days. Rather talk first? Call 0800 166 021.
That’s with us now, thanks.
Chris will ring to find a time to come and see the job. Want to talk sooner? Call 0800 166 021.